Case Study

Moving 40,000 Recipients Off a Spreadsheet

Ama Owusu · Jul 30, 2026

One team's migration from a shared spreadsheet and three vesting contracts to a single ledger, finished two weeks before their first community unlock.

The team arrived with a shared spreadsheet, three vesting contracts deployed by different people, and a community unlock five weeks away.

Reconcile first

Before moving a token, we rebuilt every schedule from on-chain history and matched it against the spreadsheet. Fourteen rows disagreed — mostly start dates typed in the wrong format.

Migrate in batches

Each batch moved only after the team's multisig signed it, with the old and new schedules shown side by side. Recipients received one email explaining what changed: nothing, except where to look.

The first unlock

Two weeks before the date, every one of the 40,000 recipients had a schedule page. The support queue on unlock day had eleven tickets.

Keep reading